The guides we actually use, yours to share.
Each resource here is something a UniBess engineer or commercial lead actually uses in a live deal. We publish them so partners and prospects can scan the same material we'd put in front of an EPCC bid team or a CFO. Updated as TNB tariffs, MIDA incentives and hardware specs change.
TNB Bukan Domestik ToU, explained for C&I sites
Why RM 97.06/kW Maximum Demand dominates a factory bill, and how a 30-minute shave changes unit economics. With a kW-to-RM calculator.
Cabinet platform: 125 kW / 261 kWh, LFP, liquid-cooled, IP55
Full DC/AC specs, environmental envelope, performance over 10 years. The hardware behind every UniBess project.
CAPEX vs Zero-CAPEX lease, and how GITA fits
Two structures, indicative pricing, payback ranges, and a GITA primer. What goes in front of your client's CFO.
1.2 MW extrusion plant: 5.22 MWh BESS, approx. RM 670k/yr saving
A real Peninsular Malaysia extrusion site, sized in two phases, with the load analysis, sizing logic and commercial structure laid out.
How EPCC partners win bids with UniBess as the battery layer
Three engagement modes, deal registration, transparent margins. What we hand you on day one.