Home · Invest & Partner

Own an asset. Back the business. Build with us.

Malaysia's power supercycle is here: MyBeST, LSS6's battery mandate, CRESS and TNB's grid build-out. There are three ways to be part of it with UniBess.

01 · Own a project

Own the asset. Earn for ten years.

A battery at a C&I site is a contracted, cash-generating asset. Own it outright or through a zero-CAPEX structure and take the demand-charge savings as a long-term return, while UniBess sources, builds and runs it.

1

The asset earns

It shaves the TNB Maximum Demand peak every month and time-shifts energy, turning avoided demand charges into a steady, contracted return.

2

You own it

Take it outright, or through a zero-CAPEX / energy-as-a-service structure where the saving funds the asset. Either way the earning is yours.

3

We run it

10-year O&M, a live dashboard and monthly KPI reports, with a written performance guarantee behind the numbers.

12–18%
Representative return p.a., peak shaving
~4 yrs
Representative payback
10 yr
O&M, performance-backed
30–70%
Share of a C&I bill that is demand charge

Where we're honest

Representative market figures, not a UniBess track record: we're pre-first-project, and we size every return on your real load data before committing anything to writing.

02 · Back the business

Back the company building it.

UniBess is an asset-light battery layer for Malaysia’s energy transition. One delivered project becomes a ten-year revenue relationship, and the pipeline is only widening as storage becomes mandatory.

Delivered project one-off hardware + EPC 10-year O&M performance-contracted Recurring revenue annuity to Year 10 Asset-light · sold through EPCC partners · de-risked by written performance contracts
P.01

Asset-light partner channel

We sell through EPCC contractors rather than chasing every end client ourselves. The EPCC keeps the relationship and the civils, EPC and grid scope; UniBess supplies the battery layer. This keeps our cost base lean and lets reach grow with the partner network instead of with headcount.

P.02

Recurring 10-year O&M revenue

Every delivered system carries a 10-year operations & maintenance commitment: live monitoring, monthly KPI reporting and on-call support. That converts one-off hardware sales into a long-tail, contracted revenue stream that compounds as the installed base grows.

P.03

Financing that closes deals

We pre-structure both outright CAPEX (which may qualify for GITA) and Zero-CAPEX operating-lease models so the asset owner can pick the funding profile that suits their balance sheet. Removing the financing hurdle shortens sales cycles and widens the addressable pipeline.

P.04

Performance-contracted, de-risked delivery

Projects ship with written performance contracts: availability, capacity retention and round-trip efficiency committed in writing, measured on a rolling 12-month basis, remedy-first. Underwritten performance de-risks delivery for the client and underpins the durability of the O&M annuity.

97%
System availability
per measurement year, peak hours
70%
Capacity retention @ Y10
contractual, nameplate
10YR
Performance warranty
in writing, remedy-first
85→78%
Round-trip efficiency
Y0 → Y10, AC-to-AC
03 · Partner on a tender

You win the bid. We deliver the battery.

LSS6 and more now require storage, and clients are asking EPCCs for BESS. We are the battery specialist behind your tender: transparent, efficient and either white-labelled or in the open.

01. How we'd work together

For you, the EPCC

What you keep

  • The client relationship and the contract front-end.
  • Civils, structural, MV interconnection, balance-of-plant scope at your margins.
  • Lead margin on the battery line, transparent, deal-registered.
  • Full visibility on the performance contract, sizing model, and O&M plan.
  • Co-branded or white-labelled proposal document, your client never has to know we're involved, if that's how you prefer to position it.
For us, UniBess

What we cover

  • BESS supply, factory-direct pricing, procurement and logistics handled.
  • Sizing study from 15-min interval data, EMS dispatch design, SLD and TNB ASP support.
  • Performance contract drafted under our name (or under yours if preferred), with capped LDs.
  • CAPEX and Zero-CAPEX lease term sheets, both ready for the client's CFO.
  • 10-year O&M, live dashboard, monthly KPI report, on-call response.

02. Three engagement modes

Mode A · White-label
UniBess invisible to client
Our work, your branding end-to-end. Suitable when you have established client trust.
Mode B · Co-branded
Joint proposal
Both logos on the deck. UniBess fronts the battery technical, you front EPC. Strong combined credibility.
Mode C · Direct intro
UniBess fronts the client
You refer, we close, you receive an introducer fee. For deals you can't service in-house.

03. Deal registration

When you bring us a deal, we work it through you. Never around you. Here is how we keep that fair:

  • We don’t approach your client directly without your say-so.
  • Your pricing and margin on the deal stay locked to what we agreed.
  • Sizing, term sheets and any pre-PO support cost you nothing.
  • Register early and you have first call on the opportunity. We give you the room to close it.

Trust is the whole point of a channel partnership. We’d rather lose a deal than go behind a partner who brought it to us.

04. What you get on day one

  • Partner pack: capability deck, cabinet platform spec, sample sizing study, sample performance contract template. All under mutual NDA.
  • Pricing sheet: transparent margins by deal size, lease vs CAPEX margin structures, O&M attachment economics.
  • Dedicated channel contact: single point of communication for your pipeline.
  • Joint pitch support: we'll sit in on technical meetings or stay backstage. Your call per deal.
  • Reference architecture: the proposal template you can re-use across your pipeline, anonymised to your branding.
Why now

Malaysia's power supercycle.

1.6 GWh
MyBeST grid-scale BESS being awarded
2 GW
LSS6 solar with mandatory storage
RM 78 bn
TNB grid capex, 2026–2030
12–18%
C&I storage returns, peak shaving

Sources: Energy Commission MyBeST, LSS6 tender, TNB. Market context, representative figures.

Let's find the right way in.

Tell us whether you want to own a project, invest in UniBess, or partner on a tender, and we'll take it from there.