Peak shaving, from your bill to year ten.

It starts by reading your TNB bill and ends a decade later with a system we still stand behind. Here is everything UniBess handles to cut your Maximum Demand: the analysis, the design, the financing, the build, and ten years of support.

In writingPerformance guarantee
LFPSafer battery chemistry
~22 wksPO → COD, Phase 1
One partnerSupply to year-10 O&M
01 · How we work

A cycle, not a hand-off.

From the first bill to year ten, one team runs every step and keeps optimising. Here is the loop.

01Analyse

Your bill & 15-min load

02Design

Sizing & EMS dispatch

03Finance

CAPEX or Zero-CAPEX

04Build

Deliver, install, commission

05Operate

10-yr O&M & monitoring

06Optimise

Track vs guarantee, re-tune

one team · ten years

02 · System architecture

How it all fits together.

The same proven stack, scaled to your site: LFP cabinets store on the DC side, the PCS converts DC↔AC, and the EMS charges and discharges against your load and tariff. With cloud monitoring 24/7. Solar and the TNB grid feed the AC bus.

EMS dispatch · 24/7
EMS dispatch EMS Solar PV DC TNB grid AC · TNB Battery cabinet LFP DC · 125 kW / 261 kWh Inverter (PCS) PCS DC ⇄ AC Site load C&I · AC Cloud monitoring 24/7
  • Solar PVDC
  • TNB gridAC · TNB
  • Battery cabinetLFP
  • Inverter (PCS)DC ⇄ AC
  • Site loadC&I
  • Cloud monitoring24/7
Solar and the TNB grid charge the LFP cabinet on the DC side; the PCS handles DC-to-AC conversion to serve the C&I load. The EMS dispatches charge and discharge against the live load and tariff, while cloud monitoring tracks the asset around the clock. Cabinet platform: 125 kW / 261 kWh per unit.
03 · Deployment timeline

From PO to commissioned asset.

Two phases: Phase 1 reaches commercial operation (COD) in about 22 weeks, full Phase 2 at roughly 52 weeks: indicative, and aligned to your EPCC programme.

  1. POW0
  2. Detailed engineering
  3. TNB approvalASP / SLD
  4. Manufacture
  5. Civils
  6. Install / commission
  7. Phase 1 COD~22 weeks
  8. Phase 2 full COD~52 weeks
Indicative programme: detailed engineering and TNB ASP / SLD approval run early, followed by equipment manufacture, civil works and install / commissioning. Phase 1 COD lands at roughly 22 weeks; full Phase 2 COD at roughly 52 weeks from PO. Actual dates depend on site conditions and TNB approval turnaround.
On the ground

Built and commissioned on your floor.

Our engineers handle the build, from delivery and installation to on-site commissioning. Here is how a UniBess system comes together on a Malaysian site.

Read the case study
05 · Sizing methodology

How we size it, and why we'll stand behind the number.

Every proposal starts from your real load, never a rule of thumb. We follow the same sequence each time, so the kW, kWh and cabinet count hold up to your client and to TNB.

  1. 01
    1 · 15-min interval data

    We begin with at least 12 months of 15-minute interval metering: the same granularity TNB uses to set Maximum Demand. No interval data, no commitment to a number.

  2. 02
    2 · Load-profile analysis

    We map the daily and seasonal load profile, isolate the peaks that drive the MD charge, and separate repeatable demand from one-off events the BESS should not chase.

  3. 03
    3 · Target MD → cabinet count + EMS logic

    From a target Maximum Demand we derive the discharge power and energy needed, then the cabinet count (125 kW / 261 kWh per unit) and the EMS dispatch logic that holds demand below target every billing window.

  4. 04
    4 · Safety & thermal margins

    We add depth-of-discharge, round-trip-efficiency, degradation and thermal headroom so the system still meets the contracted MD reduction at Year 10. Not just on day one.

Performance Guaranteed

Every UniBess project ships with a written performance contract, capacity retention, round-trip efficiency and availability, underwritten by our supplier and backstopped by us.

97%
System availability
per measurement year, peak hours
70%
Capacity retention @ Y10
contractual, nameplate
10YR
Performance warranty
in writing, remedy-first
85→78%
Round-trip efficiency
Y0 → Y10, AC-to-AC