Home · Invest & Partner

Own a BESS asset in Malaysia. Back the business. Build with us.

BESS investment in Malaysia is riding a power supercycle: MyBeST, LSS6's battery mandate, CRESS and TNB's grid build-out. There are three ways to be part of it with UniBess.

01 · Own a project

Own a BESS asset. Earn for ten years.

A battery at a C&I site is a contracted, cash-generating asset. Own it outright or through a zero-CAPEX structure and take the demand-charge savings as a long-term return, while UniBess sources, builds and runs it.

1

The asset earns

It shaves the TNB Maximum Demand peak every month and time-shifts energy, turning avoided demand charges into a steady, contracted return.

2

You own it

Take it outright, or through a zero-CAPEX / energy-as-a-service structure where the saving funds the asset. Either way the earning is yours.

3

We run it

10-year O&M, a live dashboard and monthly KPI reports, with a written performance guarantee behind the numbers.

12–18%
Representative return p.a., peak shaving
~4 yrs
Representative payback
10 yr
O&M, performance-backed
30–70%
Share of a C&I bill that is demand charge

Where we're honest

Representative market figures, not a UniBess track record: we're pre-first-project, and we size every return on your real load data before committing anything to writing.

02 · Back the business

Back the company building it.

UniBess is an asset-light battery layer for Malaysia’s energy transition. One delivered project becomes a ten-year revenue relationship, and the pipeline is only widening as storage becomes mandatory.

Delivered project one-off hardware + EPC 10-year O&M performance-contracted Recurring revenue annuity to Year 10 Asset-light · sold through EPCC partners · de-risked by written performance contracts
P.01

Asset-light partner channel

We sell through EPCC contractors rather than chasing every end client ourselves. The EPCC keeps the relationship and the civils, EPC and grid scope; UniBess supplies the battery layer. This keeps our cost base lean and lets reach grow with the partner network instead of with headcount.

P.02

Recurring 10-year O&M revenue

Every delivered system carries a 10-year operations & maintenance commitment: live monitoring, monthly KPI reporting and on-call support. That converts one-off hardware sales into a long-tail, contracted revenue stream that compounds as the installed base grows.

P.03

Financing that closes deals

We pre-structure both outright CAPEX (which may qualify for GITA) and Zero-CAPEX operating-lease models so the asset owner can pick the funding profile that suits their balance sheet. Removing the financing hurdle shortens sales cycles and widens the addressable pipeline.

P.04

Performance-contracted, de-risked delivery

Projects ship with written performance contracts: availability, capacity retention and round-trip efficiency committed in writing, measured on a rolling 12-month basis, remedy-first. Underwritten performance de-risks delivery for the client and underpins the durability of the O&M annuity.

≥97%
System availability
per measurement year, peak hours
≥70%
Capacity retention @ Y10
contractual, nameplate
10YR
Performance warranty
in writing, remedy-first
85→78%
Round-trip efficiency
Y0 → Y10, AC-to-AC
03 · Partner on a tender

You win the EPCC bid. We deliver the BESS.

LSS6 and more now require storage, and clients are asking EPCCs for BESS. We are the battery specialist behind your tender: transparent, efficient and either white-labelled or in the open.

01. How we'd work together

For you, the EPCC

What you keep

  • The client relationship and the contract front-end.
  • Civils, structural, MV interconnection, balance-of-plant scope at your margins.
  • Lead margin on the battery line, transparent, deal-registered.
  • Full visibility on the performance contract, sizing model, and O&M plan.
  • Co-branded or white-labelled proposal document, your client never has to know we're involved, if that's how you prefer to position it.
For us, UniBess

What we cover

  • BESS supply, factory-direct pricing, procurement and logistics handled.
  • Sizing study from 15-min interval data, EMS dispatch design, SLD and TNB ASP support.
  • Performance contract drafted under our name (or under yours if preferred), with capped LDs.
  • CAPEX and Zero-CAPEX lease term sheets, both ready for the client's CFO.
  • 10-year O&M, live dashboard, monthly KPI report, on-call response.

02. Three engagement modes

Mode A · White-label
UniBess invisible to client
Our work, your branding end-to-end. Suitable when you have established client trust.
Mode B · Co-branded
Joint proposal
Both logos on the deck. UniBess fronts the battery technical, you front EPC. Strong combined credibility.
Mode C · Direct intro
UniBess fronts the client
You refer, we close, you receive an introducer fee. For deals you can't service in-house.

03. Deal registration

When you bring us a deal, we work it through you. Never around you. Here is how we keep that fair:

  • We don’t approach your client directly without your say-so.
  • Your pricing and margin on the deal stay locked to what we agreed.
  • Sizing, term sheets and any pre-PO support cost you nothing.
  • Register early and you have first call on the opportunity. We give you the room to close it.

Trust is the whole point of a channel partnership. We’d rather lose a deal than go behind a partner who brought it to us.

04. What you get on day one

  • Partner pack: capability deck, cabinet platform spec, sample sizing study, sample performance contract template. All under mutual NDA.
  • Pricing sheet: transparent margins by deal size, lease vs CAPEX margin structures, O&M attachment economics.
  • Dedicated channel contact: single point of communication for your pipeline.
  • Joint pitch support: we'll sit in on technical meetings or stay backstage. Your call per deal.
  • Reference architecture: the proposal template you can re-use across your pipeline, anonymised to your branding.
Why now

Malaysia's power supercycle.

1.6 GWh
MyBeST grid-scale BESS being awarded
2 GW
LSS6 solar with mandatory storage
RM 78 bn
TNB grid capex, 2026–2030
12–18%
C&I storage returns, peak shaving

Sources: Energy Commission MyBeST, LSS6 tender, TNB. Market context, representative figures.

Let's find the right way in.

Tell us whether you want to own a project, invest in UniBess, or partner on a tender, and we'll take it from there.